Excess Soil Management

Excess Soil

Plan your soil before you dig, and keep your project moving.

Almost every construction, development and infrastructure project in Ontario produces excess soil, and where it goes is regulated under O. Reg. 406/19. Peritus helps builders, developers and their engineers characterize soil, find the right place for it and complete the paperwork, so trucks aren’t turned away and schedules don’t slip.

 

What changes on January 1, 2027

Starting January 1, 2027, cleaner excess soil that’s suitable for reuse is restricted from going to landfill, with limited exceptions. If your project planned to landfill soil, you may need a reuse site, a different disposal route or more sampling to prove where the soil can go. Projects excavating in 2027 should plan now.

 

Who needs to plan for excess soil

  • Builders and developers with basements, underground parking or site grading
  • Excavation and site servicing contractors moving soil off site
  • Municipalities and infrastructure owners with road, sewer and watermain projects
  • Owners of properties with past industrial or commercial use, where soil quality is uncertain

Larger projects, and those on sites with a history of potential contamination, have extra requirements under the regulation, including filings on the Excess Soil Registry.

 

What we do

  • Assessment of past uses: a review of the site’s history to identify areas of potential concern.
  • Sampling and analysis plans: where and how to sample so the results are accepted by receiving sites.
  • Soil characterization: test pits, boreholes and stockpile sampling, with lab results compared to Ontario’s excess soil quality standards.
  • Registry and paperwork: Excess Soil Registry notices, soil characterization reports and the Qualified Person declarations the regulation requires.
  • Segregation and stockpile management: keeping soils of different quality apart on site so clean soil isn’t mixed with impacted soil.

 

How it works

  1. Early call: we review your plans, volumes and schedule.
  2. Site history and sampling plan.
  3. Sampling and lab results: usually before excavation, so you can price and plan disposal.
  4. Reuse or disposal plan: where each soil type can go.
  5. Filings and tracking through to the last load.

 

Proof

For a residential development in the Greater Toronot Area with underground parking, we sampled and characterized two large stockpiles, then characterized about 115,000 m³ of soil ahead of excavation, so the developer could plan where it would go.

 

Excavating in 2027?

The earlier soil is characterized, the more options you have. Talk to us before you tender.

FAQ

Does O. Reg. 406/19 apply to my project?

If soil leaves your site, parts of it almost certainly do. The size of the project and the site’s history decide how much paperwork is needed.

What is a Qualified Person and why do I need one?

A Qualified Person (QP) is a licensed engineer or professional geoscientist who meets Ontario’s requirements. The regulation requires a QP to prepare or oversee key steps, such as the sampling plan and soil characterization.

Can I still send soil to landfill after January 1, 2027?

Soil that’s contaminated or doesn’t meet reuse standards can still go to a landfill that accepts it. The restriction targets cleaner soil that could be reused, with some exceptions.

When should we sample?

Before you tender the excavation, if possible. Results let contractors price disposal accurately and help you avoid surprises during digging.

What happens if soil goes to the wrong place?

The project leader can be responsible for soil that ends up at a site not allowed to receive it, and it may have to be dug up and moved again.

Dig deeper.
Learn more about managing excess soil in our article.